Street Operations

Welcome to the Street Operations Division of Public Works! We are dedicated to maintaining and enhancing our community's roadway infrastructure. Our team ensures that all roadways are safe, accessible, and well-maintained for the daily commute and long-term transportation needs. From routine inspections and repairs to residential rehabilitation projects, we are committed to keeping our roadways in top condition for all users.

Street Closures and Traffic Impacts

  • $2.1 Million East Surfside Boulevard Reconstruction Project Begins Nov. 9

    A $2.1 million reconstruction project on East Surfside Boulevard will begin Monday, Nov. 9, closing the corridor between Breakwater Avenue and Elm Street through May 2027. A section of Elm Street connecting to it will also be closed during construction.

  • Downtown Street Striping Upgrades to Begin November 9

    Traffic striping upgrades throughout downtown Corpus Christi will begin Monday, November 9. The multi-phase project aims to improve road clarity and driver safety. Work will occur in three sequential phases over approximately seven weeks. First phase is Water Street (Furman Ave. to I-37): Rolling single-lane closures with two-way traffic open; expected to take two weeks.

  • City of Corpus Christi Awarded $3.5 Million Federal Grant for Major Pedestrian Safety and Sidewalk Expansions

    The City of Corpus Christi has been awarded over $3.5 million in federal grant funding by the Corpus Christi Metropolitan Planning Organization (MPO) to construct three major sidewalk and trail connection projects.

  • Water Line Work Extended on Flour Bluff Drive

    Work on Flour Bluff Drive between Cornerstone Drive and Micah Street will continue while crews work on water line improvements. The lane reduction, which was scheduled to end today, will now continue through Wednesday, November 11.

  • Emergency Street Repair on Baldwin Boulevard

    City of Corpus Christi Public Works crews are performing emergency street repairs on Baldwin Boulevard near the intersection at Ayers Street. Repairs will require the closure of the eastbound left lane along Baldwin Boulevard on both sides of the intersection at Ayers Street. Work is expected to be completed overnight.

Follow Our Facebook

Facebook Feed

 

 

 

Search available job openings

About Us

The Mission of the Public Works Department is to manage, maintain, and develop the City's street and storm water systems. This is accomplished by maintaining street pavement; operating and maintaining traffic signals, signs and markings, planning and developing the street system; and providing storm water management services. 

facebook

Contact Information

Address: 
2525 Hygeia Street
Corpus Christi, Texas 78415

To Report a Problem:
» Call 3-1-1

Street Operations:
» (361) 826-1961

Storm Water:
» (361) 826-1610

Traffic Operations:
» (361) 826-3547